Watercare
ICR Studio have been asked to be part of the design team for the new water treatment plant which will be fast tracked into producing treated water early 2021
ICR Studio have been asked to be part of the design team for the new water treatment plant which will be fast tracked into producing treated water early 2021. Its all hands on deck as the new facility needs to be design, documented and constructed. ICR Studio have been given the task of driving the design of the building and integrating plant, equipment and services into the design. We are working with Fletcher Construction to establish fast track project methodologies and material selection.